Accessory structures 100 sq. feet & under, no permit is required.
Accessory structures 100+ sq. feet to 999 sq. feet $121.00 Accessory structures (performance structures) 1,000 to 1,250 Sq. feet (over-the-counter) $182.00 Accessory structures over 1,250 sq. feet (Conditional Use) $424.00
Interim conditional use $484.00 Variance $484.00 Special meeting for variance $484.00
New homes (over-the-counter) $424.00 Addition to homes (over-the-counter) $152.00 Example: basements, dormers, and decks
Signs: 6 sq. feet or smaller $73.00 Signs: 6+ to 12 sq. feet $145.00 Signs: Over 12 sq. feet (conditional use) $484.00
Commercial structures (conditional use including sign) $726.00 Permit for commercial structure $303.00
Wind generation power system $726.00 Communication towers $1,815.00 Solar panels $145.00 Soil farming (Conditional use) $726.00 Utility corridor (establishment or modification $6,655.00 plus 1/2% of the total cost of the project)
Appeals to Town Board $424.00 Home business (conditional use) $484.00 Home occupation $91.00
Amendments to Land Use Plan (Comprehensive Plan) $6,655.00 Amendments to zoning map $732.00 Permit Renewal $61.00 Variance for deck 150 sq. feet or less $182.00
Planned Unit Development:
Residential: 6 or fewer Units $3,993.00 Commercial $5.324.00 7 or more units: $133.00* Mixed $6,655.00 (* + $121.00 for each additional unit)
SCHEDULE OF PERMIT CHARGES
Accessory structures 100 sq. feet & under, no permit is required.
Accessory structures 100+ sq. feet to 999 sq. feet $121.00
Accessory structures (performance structures) 1,000 to 1,250
Sq. feet (over-the-counter) $182.00
Accessory structures over 1,250 sq. feet (Conditional Use) $424.00
Interim conditional use $484.00
Variance $484.00
Special meeting for variance $484.00
New homes (over-the-counter) $424.00
Addition to homes (over-the-counter) $152.00
Example: basements, dormers, and decks
Signs: 6 sq. feet or smaller $73.00
Signs: 6+ to 12 sq. feet $145.00
Signs: Over 12 sq. feet (conditional use) $484.00
Commercial structures (conditional use including sign) $726.00
Permit for commercial structure $303.00
Wind generation power system $726.00
Communication towers $1,815.00
Solar panels $145.00
Soil farming (Conditional use) $726.00
Utility corridor (establishment or modification $6,655.00
plus 1/2% of the total cost of the project)
Appeals to Town Board $424.00
Home business (conditional use) $484.00
Home occupation $91.00
Amendments to Land Use Plan (Comprehensive Plan) $6,655.00
Amendments to zoning map $732.00
Permit Renewal $61.00
Variance for deck 150 sq. feet or less $182.00
Planned Unit Development:
Residential:
6 or fewer Units $3,993.00 Commercial $5.324.00
7 or more units: $133.00* Mixed $6,655.00
(* + $121.00 for each additional unit)
Review Fee: $242.00 Credit toward Conditional Use Permits
Parcel Review $61.00
Approved by the Midway Town Board on the day _________ of __________________. 2024.